Facade installation with rope access at the CBRT Tower
Assembly, silicone insulation, testing, electrical-electronics, NDT and welding operations on the exterior of high-rise buildings.
- Location
- Istanbul Financial Center
- Sector
- Tall Buildings
- Service
- Facade assembly and technical applications

Project need
What work did we carry out on the facade?
The height of the building, facade geometry and assembly points that require different expertise; It required a comprehensive access, backup and site security plan.
Application
How did we plan the assembly and technical work?
After the risk assessment and method plan, the facade sections were divided into stages; Assembly, isolation, testing and quality control work were carried out by experienced teams.
Work areas
- Glass and façade module assembly
- Sun shading installation
- Silicone insulation
- Tightness tests
- Electric-electronic lighting systems
- NDT and welding work within the scope of quality control
Application process
A comprehensive risk assessment and method plan was prepared for the application points.
Working and backup lines were designed according to different front stages.
The safety of the above and below work areas was checked together.
Teams with rope access and installation experience worked in coordination for different technical scopes.
Working point in glass and module assembly
Our scope of work at the CBRT Tower included glass, facade module and solar shading installation. Applications on different facade elements were discussed together with the access and installation plan to the relevant facade section.
In the field archive you can see our team working next to the panel and the moment the glass panel was positioned with vacuum lifting equipment. The photos show the technicians' workplace on the façade and the position of the glass panel at the installation point.
Facade joints and other technical work
In addition to assembly works, silicone insulation, leakage tests and electrical-electronic lighting applications were also included in our scope of this project. NDT and welding works within the scope of quality control constituted different technical application points.
The close-up weld photo in the gallery shows one of the jobs being performed on the metal joint. Glass installation, joint insulation and metal connection works have different application and control needs on the same structure.
What information is needed for a similar facade survey?
For preliminary evaluation, share the type of facade element, the work to be done, its approximate size and weight, and the floor or height on which it is located. General elevation photographs and images showing connection details make it easier to understand the installation point and access need.
The limits of assembly, insulation, electrical or inspection works must be specified separately in the proposal. The control method, photographs and technical records requested upon delivery, and working hours are determined according to the project requirements.
You can submit a survey request with your location and target date for high-rise building projects across Türkiye.
Services in this project
Industrial Rope Access
Maintenance, cleaning, repair and installation at high and difficult to access points throughout Türkiye. Access plan suitable for the structure, technical team suitable for the job.
Exterior Silicone and Joint Renewal
Access, repair and application services against water and air leaks at facade joints.
Installation and Torquing at Height
Controlled assembly of steel, mechanical and electronic equipment in hard-to-reach points.
NDT Inspection and Technical Reporting
Safe working access for non-destructive testing teams on difficult-to-access structures and equipment.
Welding Services at Height
Hard-to-access welding, repair and connection applications in steel structures and industrial equipment.
Electrical and Lighting Works at Height
Electrical infrastructure, armature and cable applications on facades, towers and high ceilings.
High-Rise Glass Replacement
Controlled management of access, removal, removal and installation steps of damaged glass on high facades.
ON SITE
Photos from the project.
Positioning of the façade panel, glass installation with vacuum lifting equipment and welding on the metal joint. You can examine our different works in the CBRT field by enlarging the photos.

Rope access team working together on the high glass façade

Installation and positioning of the façade panel

Facade application at sunset and night hours

Placing the glass panel with vacuum lifting equipment

Welding work on metal joint at height

Olimpos team at the CBRT field

Olimpos team at the CBRT field
What installation or repair will be done on your facade?
Share the location of the structure, type of facade element, approximate dimensions and photos of the working point. Let's evaluate the access and technical application scope together.