
Istanbul Financial Center
CBRT Tower
Facade assembly and technical applications
- NDT work within the scope of quality control
- Access to technical application points at the front
Safe working access for non-destructive testing teams on difficult-to-access structures and equipment.

Reaching inspection points in towers, tanks, pipelines and steel structures is often the most difficult part of the operation. rope access enables quick access to required control points and regular recording of field data.
Coordinated field support for facilities and inspection teams that require safe access to inspection points and traceable records in tanks, pipelines, steel construction, towers and high equipment.
Welding and steel connection checks
Tanks, silos and pipelines
Tower and high carrier systems
Corrosion and surface condition detection
Source, connection and surface points at different elevations are included in the access plan according to their asset codes.
A limited number of checkpoints can be accessed under favorable conditions with lower space occupation.
Access technicians and competent personnel of the NDT method to be applied are organized in the same work plan.
Photos, asset numbers, and control points can be mapped to the report format.
Access routes are created using the checklist, structure geometry and work sequence.
Access, cleaning and surface conditions required by the inspection method are coordinated with technical teams.
The location of the findings, their photographs and relevant asset information are recorded according to the delivery format.
The asset list, inspection method, number of points and site conditions are evaluated.
Lines, team organization, area isolation and work order are determined.
Access to control points is provided and technical implementation is carried out by authorized personnel.
Records, findings and photographs are delivered in the agreed report format.
In the NDT request, it is first clarified which asset, which points and by which method will be examined. The number of points, surface preparation and registration pattern for the tank body, pipeline and weld joint may differ. The role of the rope access team and the responsibility of the inspection personnel are clearly defined in the same work plan.
In our CBRT Tower project, NDT works within the scope of quality control were among the technical applications. In a similar request, you can share the inspection plan, point list, acceptance criteria, if any, and the technical side that will prepare the report. The access record and the scope of delivery of the inspection report are specified separately.
For the final offer, access conditions and the work to be done are evaluated together. The main issues affecting the cost of this service are:
The method to be applied, surface preparation and distribution of control points affect the duration.
The geometry of the tank, tower, pipeline or steel structure determines the crew plan.
Facility permits, shifts, operational halt and mobilization conditions are evaluated.
Dot coding, photography, measurement and signature requirements are included in the offer.
No. rope access is the method of reaching the working point; NDT, on the other hand, is an inspection practice that requires separate technical competence. In the project, two qualifications are planned together.
Compliance can be evaluated in difficult-to-access assets such as tanks, silos, pipelines, towers, steel construction, façade elements and welded connections.
Method; It is determined by authorized technical parties according to the material, defect type, standard and employer's inspection plan. The access plan is prepared according to this requirement.
Depending on the scope of the project, control points, methods, findings and photographs can be delivered in a traceable report format.
The method, number of points, surface preparation, difficulty of access, shift and reporting standard are evaluated together after the survey.
Reporting responsibility is determined at the proposal stage with the competent technical party appropriate to the method to be used and the project requirements. The rope access field record and the inspection report should be defined as separate deliverables.
Review project scopes with relevant work items.

Istanbul Financial Center
Facade assembly and technical applications

Offshore structures
Offshore technical applications
Rope access is not an inspection method. With safe access, NDT qualification, surface preparation and reporting must be coordinated in the same operation.
Read the guideThe certificate logo alone is not sufficient. Access competence, the technical work to be done and the project-specific security plan must be verified together.
Read the guideCondition assessment, surface preparation and protective coating support on steel structures and equipment.
Hard-to-access welding, repair and connection applications in steel structures and industrial equipment.
Maintenance support on high and difficult-to-access mechanical equipment, connections and steel elements.
Maintenance, cleaning, repair and installation at high and difficult to access points throughout Türkiye. Access plan suitable for the structure, technical team suitable for the job.