OLYMPOS ON THE FIELD
Our team
at work.
From high facades to factory interiors, from towers to ships. Take a closer look at our team's working moments and the applications we have completed.
Browse by work area
298 photos

General view of Bursa Uludağ University New Mosque and Complex

Rope access work at the minaret balcony

The Olimpos team working around the minaret

Lowering removed marble sections using a rope system

General view of the minaret during marble removal

Lowering marble sections from the balcony edge

The lowering line along the minaret shaft

View from the minaret towards the balcony and domes

A rope access technician working on the balcony connections

Accessing the installation point on the minaret

General view of aluminium composite balcony installation

Installing aluminium composite elements on the minaret balcony

Teamwork and balcony connections on the minaret

Preparing the work position for balcony installation

Two technicians carrying out installation work around the minaret

Installation work on the second minaret balcony

The completed first minaret balcony

Facade application at sunset and night hours

Rope access work on the high ceiling of the terminal

Rope access panel painting at TOGG production facility

Rope access team working together on the high glass façade

Two technicians working together near frontline equipment

Surface cleaning of glass façade with rope access

Working under ship overhang at sunset

Welding work on metal joint at height

Two technicians working together on the minaret surface

Installation of high-rise sign holders

Polyurethane foam application with rope access on the exterior

Installation of the Turkish flag in the building space

Olimpos team at the CBRT field

Installation and positioning of the façade panel

Rope lines installed along the shaft and working point

Positioning the metal element with lifting straps

Surface cleaning of the ship's exterior with a hand tool

Equipment preparation before field work

Sealing application with a mastic gun at the facade junction

Technical work on ceiling carriers and lighting points

Olimpos team at the CBRT field

Installation and positioning of the façade panel

Application on high panel surface in TOGG paint shop

Installation of signage on tower crane

Rope access work on the high-rise façade

Rope access work on the high-rise façade

Two technicians working together near frontline equipment

Technical application under the façade overhang

Technical application under the façade overhang

Technical application under the façade overhang

Two technicians working with rope lines on the facade at night

Technical application under the façade overhang

Technical application under the façade overhang

Technical application under the façade overhang

Technical application under the façade overhang

Technical application under the façade overhang

Technical application under the façade overhang

Maintenance and metalworking in narrow shaft

Rope access work on the high-rise façade

Maintenance and metalworking in narrow shaft

Maintenance and metalworking in narrow shaft

Maintenance and metalworking in narrow shaft

Rope access work on the high-rise façade

Maintenance and metalworking in narrow shaft

Maintenance and metalworking in narrow shaft

Maintenance and metalworking in narrow shaft

Technician preparing to work at the front

City and rainbow view from working level

Rope access work on the high-rise façade

Rope access work on the high-rise façade

BRSA facade illuminated at night

Maintenance and metalworking in narrow shaft

Technical work on the facade grille and service area

Technician preparing to work at the front

Technical work on the facade grille and service area

Access via rope lines in the shopping mall shaft

Access via rope lines in the shopping mall shaft

Access via rope lines in the shopping mall shaft

Working on high ceilings and steel carriers

Working on high ceilings and steel carriers

Working on high ceilings and steel carriers

Access via rope lines in the shopping mall shaft

Interference with metal elements in the internal space

Interference with metal elements in the internal space

Access via rope lines in the shopping mall shaft

Interference with metal elements in the internal space

Access via rope lines in the shopping mall shaft

Access via rope lines in the shopping mall shaft

Interference with metal elements in the internal space

Positioning the metal element with lifting straps

Positioning the metal element with lifting straps

Working on high ceilings and steel carriers

Working on high ceilings and steel carriers

Interference with metal elements in the internal space

Working on high ceilings and steel carriers

Working on high ceilings and steel carriers

Working on high ceilings and steel carriers

Night view of the Mall of Istanbul entrance

Access to interior lighting elements

Maintenance at facade joints and panel edges

Sealing application with a mastic gun at the facade junction

Maintenance at facade joints and panel edges

Maintenance application with rope access on the exterior

Exterior view of the building under maintenance

Maintenance at facade joints and panel edges

Maintenance at facade joints and panel edges

Maintenance at facade joints and panel edges

Sealing application with a mastic gun at the facade junction

Maintenance at facade joints and panel edges

Maintenance at facade joints and panel edges

Sealing application with a mastic gun at the facade junction

View of the work area from the side of the facade

Surface cleaning of glass façade with rope access

Exterior view of the building under maintenance

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

View of the work area from the side of the facade

Exterior view of the building under maintenance

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Surface cleaning of glass façade with rope access

Surface cleaning of glass façade with rope access

Exterior view of the building under maintenance

Surface cleaning of glass façade with rope access

Surface cleaning of glass façade with rope access

Surface cleaning of glass façade with rope access

Exterior view of the building under maintenance

Surface cleaning of glass façade with rope access

Maintenance work on exterior wall and facade details

Maintenance work on exterior wall and facade details

Surface cleaning of glass façade with rope access

Sealing application with a mastic gun at the facade junction

Sealing application with a mastic gun at the facade junction

Surface cleaning of glass façade with rope access

Maintenance work on exterior wall and facade details

Surface cleaning of glass façade with rope access

Surface cleaning of glass façade with rope access

Exterior view of the building under maintenance

Working lines established along the front

Turkish flag hung on the building facade

Turkish flag hung on the building facade

Turkish flag hung on the building facade

Rope line preparation for flag installation on the roof

Turkish flag hung on the building facade

Rope access work area in the minaret

Rope access work area in the minaret

Rope access work area in the minaret

Two technicians working together on the minaret surface

Rope access work area in the minaret

Night view of the airport control tower

Rope access work on the high ceiling of the terminal

Rope access during technical practice at night

Team preparation in high rack and installation area

Team preparation in high rack and installation area

Intervention in pipes and installation elements at ceiling level

Intervention in pipes and installation elements at ceiling level

Intervention in pipes and installation elements at ceiling level

Intervention in pipes and installation elements at ceiling level

Intervention in pipes and installation elements at ceiling level

Equipment and connection work next to high racks

Equipment and connection work next to high racks

Equipment and connection work next to high racks

Intervention in pipes and installation elements at ceiling level

Intervention in pipes and installation elements at ceiling level

Rope access work on the high ceiling of the terminal

Technical work on ceiling carriers and lighting points

Technical work on ceiling carriers and lighting points

Technical work on ceiling carriers and lighting points

Technical work on ceiling carriers and lighting points

Technical work on ceiling carriers and lighting points

Rope access team working together on the high glass façade

Installation and positioning of the façade panel

Facade application at sunset and night hours

CBRT Tower facade view

Technician on rope lines at frontage working point

Installation and positioning of the façade panel

Rope access team working together on the high glass façade

Rope access team working together on the high glass façade

Technician on rope lines at frontage working point

Facade application at sunset and night hours

Facade application at sunset and night hours

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Facade application at sunset and night hours

Olimpos team at the CBRT field

Olimpos team at the CBRT field

CBRT Tower facade view

Rope access team working together on the high glass façade

Olimpos team at the CBRT field

Placing the glass panel with vacuum lifting equipment

Olimpos team at the CBRT field

Technician on rope lines at frontage working point

Rope access team working together on the high glass façade

Placing the glass panel with vacuum lifting equipment

Placing the glass panel with vacuum lifting equipment

Placing the glass panel with vacuum lifting equipment

Olimpos team at the CBRT field

Rope access team working together on the high glass façade

Application in facade carriers and fasteners

Olimpos team at the CBRT field

Technical application on the CBRT Tower facade

CBRT Tower facade view

Technician on rope lines at frontage working point

Application in facade carriers and fasteners

Technician on rope lines at frontage working point

Equipment preparation before field work

Placing the glass panel with vacuum lifting equipment

Rope access team working together on the high glass façade

Technical treatment of facade joints and panel edges

Rope access team working together on the high glass façade

Rope access team working together on the high glass façade

Installation and positioning of the façade panel

Technician on rope lines at frontage working point

Application in facade carriers and fasteners

View of the façade assembly from the interior work area

Installation and positioning of the façade panel

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Installation and positioning of the façade panel

Installation and positioning of the façade panel

View of the façade assembly from the interior work area

Welding work on metal joint at height

Application in facade carriers and fasteners

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Placing the glass panel with vacuum lifting equipment

Technical treatment of facade joints and panel edges

City view from the facade platform

Installation and positioning of the façade panel

Installation and positioning of the façade panel

Technician on rope lines at frontage working point

Technical treatment of facade joints and panel edges

Rope access team working together on the high glass façade

Facade application at sunset and night hours

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Technician on rope lines at frontage working point

Team working with rope on ship exterior

Maintenance and surface preparation on ship metal surfaces

Rope access along ship hull

Team working with rope on ship exterior

Team working with rope on ship exterior

Maintenance and surface preparation on ship metal surfaces

Work area on ship deck

Appearance of the exterior wall with polyurethane foam applied

Sign installation and surface work in commercial areas

Working with rope lines on the facade advertising surface

Facade details of advertising and signage application

Working with rope lines on the facade advertising surface

Facade details of advertising and signage application

Working with rope lines on the facade advertising surface

Working with rope lines on the facade advertising surface

Working with rope lines on the facade advertising surface

Working with rope lines on the facade advertising surface

Working with rope lines on the facade advertising surface

Facade details of advertising and signage application

Facade details of advertising and signage application

Facade details of advertising and signage application

Examination of the site plan for signage work

Working with rope lines on the facade advertising surface

View of the completed illuminated sign on the facade

Access to façade signage at night

Access to façade signage at night

View of the completed illuminated sign on the facade

Preparation of sign elements before assembly

Installation of signage on tower crane

Preparation before work on the front line

Access to façade signage at night

Access to façade signage at night

View of the completed illuminated sign on the facade

View of the completed illuminated sign on the facade

Installation of high-rise sign holders

Installation of high-rise sign holders

Installation of high-rise sign holders

Installation of high-rise sign holders

Installation of high-rise sign holders

View of the completed illuminated sign on the facade

Installation of high-rise sign holders

Installation of high-rise sign holders

Installation of high-rise sign holders

Installation of high-rise sign holders

Installation of high-rise sign holders

View of the completed illuminated sign on the facade

Rope work on large facade advertising surface

Rope work on large facade advertising surface

Sign installation and surface work in commercial areas

Sign installation and surface work in commercial areas

Sign installation and surface work in commercial areas

Sign installation and surface work in commercial areas

Access to the carrier area behind the sign

Sign installation and surface work in commercial areas

Sign installation and surface work in commercial areas

Access between high steel carriers at TOGG facility
A MOMENT FROM THE FIELD
A closer look
at facade work.
Working position, equipment and frontage access on rope lines. A short field view from the maintenance application.
Our facade maintenance serviceWhat can we do in your structure?
Share a photo of your workspace and your needs. Let's evaluate the access conditions and the work to be done together.