Gemlik, Bursa
TOGG Production Facility
Paint application at height
- High panel surfaces of the paint shop section
- Paint application and visual inspection with rope access
Surface preparation, paint and protective coating applications on facades and industrial structures.

Resistance of paint application at height; depends on surface preparation, environmental conditions and the correct layer system, as well as access. Olimpos divides the work area into sections; It carries out the preparation, application and control steps in a recorded manner.
Technical application service for businesses that want to have maintenance painting, renewal or protective coating on high facades and industrial surfaces without installing scaffolding or platforms.
High-rise building exteriors
Factory and steel constructions
Tanks, silos and chimneys
Tower and high equipment
Intervention can be planned for paint deterioration in scattered or limited areas without covering the entire facade with scaffolding.
Appropriate access routes are created on towers, chimneys, tanks and recessed facades.
The surface condition is examined; The preparation and coating system is determined according to the technical requirement.
Loose paint, dirt and rust are removed from the surface by mechanical or appropriate methods within the scope.
Primer, intermediate coat and top coat requirements are planned according to the product's technical document and project conditions.
Weather, surface and application conditions are monitored; completed areas are visually inspected.
Surface, paint loss, access and environmental conditions are examined.
The preparation method, product system, consumption and stages are determined.
The surface is prepared and coats are applied according to technical requirement.
Once the application is completed, a photo delivery record is prepared.
At TOGG Gemlik production facility, we applied paint by reaching the high panel surfaces of the paint shop section with a rope. The work area was divided according to panel surfaces; completed surfaces were visually inspected.
For a similar job, share the material and approximate area of the surface to be painted. Knowing which surfaces require preparation, the condition of the existing coating, and the hours the facility can devote to work determines how many stages the job will be bid for.
For the final offer, access conditions and the work to be done are evaluated together. The main issues affecting the cost of this service are:
Rust, old paint and preparation needs directly affect the total time.
Product type, number of layers, consumption and drying intervals are evaluated.
Height, line installation, wind protection, bottom area and adjacent surfaces are planned.
If the construction and anchorage conditions are suitable, regional or planned exterior painting works can be carried out with rope access.
Surface preparation is determined according to the adherence of the existing paint, rust, blistering and the product system. Direct application over loose or incompatible layers is not recommended.
Yes. Temperature, surface humidity, wind and rainfall must be compatible with the application and drying conditions of the product used.
An offer is prepared after the survey based on the area, surface preparation, paint system, number of layers, access installation and work schedule.
ON SITE
Examples of the panel painting and preparatory work on the ship surface at TOGG. Preparation and crayons are determined by the condition of the surface.
Review project scopes with relevant work items.

Gemlik, Bursa
Paint application at height

Offshore structures
Offshore technical applications
Condition assessment, surface preparation and protective coating support on steel structures and equipment.
Local repair applications with loose parts control on high facades, concrete and stone surfaces.
Maintenance, reinforcement and modification works with difficult access to glass, panels, profiles and facade elements.
Maintenance, cleaning, repair and installation at high and difficult to access points throughout Türkiye. Access plan suitable for the structure, technical team suitable for the job.