Marmara Tower facade maintenance and sealing works

Rope access intervention at points requiring maintenance, insulation and sealing on the exterior of high-rise buildings.

Location
Istanbul
Sector
Tall Buildings
Service
Facade maintenance, insulation and sealing
Architectural visual of the Marmara Tower in the city and sea view
Architectural visual of the Marmara Tower in the city and sea view.

Project need

Local maintenance on a high-rise facade

The architecture of the building limited permanent access to maintenance and isolation points on the façade by scaffolding or platform.

Application

Intervention planned according to the facade axes

Façade work areas and access routes have been determined; Maintenance, insulation and sealing applications were carried out in regional stages.

Work areas

  • High-rise building exterior access
  • Exterior maintenance applications
  • Insulation works
  • Sealing applications

Application process

  1. The façade geometry and intervention points were examined during the site survey.

  2. Rope lines were planned according to different facade axes.

  3. Maintenance and sealing works were carried out in designated areas.

  4. Completed points were checked by visual records.

Facade works on the Marmara Tower

The Marmara Tower work included rope access to maintenance, insulation and sealing points on the high-rise exterior. After examining the geometry of the building and the areas requiring intervention, access routes were determined according to the facade axes.

The practices were carried out in regional stages; completed points were checked with visual records. This work is an example of a maintenance approach that focuses on specific areas on the front line.

Why does water ingress require a site survey?

In a similar facade request, the trace of moisture or water seen inside and the intervention point outside are evaluated together. Joints, surrounding surfaces, and existing repair marks help determine the scope of work.

According to the site survey result, the application area, surface preparation and suitability of the material to be used are discussed. Sharing the conditions under which the leak complaint arose makes the initial investigation easier.

Site survey request for a similar high-rise building

You can send building location, problematic facade and floor information, close/far photos and previous application records, if any. Access to the roof and hours of use of the building also affect the work schedule.

Clearly stating the areas to be intervened and the control method in the proposal ensures that the scope of maintenance is clarified between the building management and the application team.